Map every water and drain connection
List the sink, faucet, disposal, dishwasher, refrigerator supply, filtration, and any other water-using equipment. Note what stays, moves, or is removed. A deeper sink or different cabinet can change room for piping and equipment. Ask the provider to confirm the actual layout rather than assuming new products fit the old connections.
Coordinate dimensions and service access
Use exact product specifications for mounting, holes, drain positions, hoses, power, and clearance. Consider future access to fixture stops, filters, traps, and appliance connections. A pullout bin or fixed shelf may obstruct service even when the finished cabinet looks generous. Resolve those conflicts before the countertop and cabinetry make changes harder.
- Sink depth and mounting
- Faucet and filter holes
- Disposal and drain alignment
- Appliance movement and access
Set the permit and trade sequence
Ask the current Village Building Department and accountable provider which requirements apply to the address and scope. Plumbing, electrical, cabinetry, counters, and finishes may need coordinated timing. State who disconnects, reconnects, tests, and signs off each component. A handoff should not leave one trade assuming another checked a hidden connection.
Test after equipment returns to position
A complete handoff checks normal faucet use, sink drainage, disposal operation when included, dishwasher discharge, refrigerator supply, and any disturbed joint. Ask whether built-in equipment is returned to position before the final leak check. Keep model details, test findings, warranty information, and the responsibility for any remaining adjustment.
- Connection inventory
- Trade handoff
- Full-use tests
- Service access after installation